Start Date End Date Plan/Proposal
 Order Form
<April 2026>
SuMoTuWeThFrSa
2930311234
567891011
12131415161718
19202122232425
262728293012
3456789
<June 2026>
SuMoTuWeThFrSa
31123456
78910111213
14151617181920
21222324252627
2829301234
567891011


Checkboxes will be CLEARED when re-sorting the table.
If Cnt=(0) then TxDOT hasn't released the plans yet
Paper Plans 
Paper Prop's 
Bid Date Ascending
Cnt 
County Ascending
District 
HWY 
Control 
Estimate 
Description 
04/08/2026(99)ANGELINALUFKINVARIOUS0911-00-127$1,032,174BRIDGE MAINTENANCE
04/23/2026(6)ARCHERWICHITA FALLSSH00796500-73-001$826,447MATERIAL MAINTENANCE PROJECT-HOT MIX
04/07/2026(70)BASTROPAUSTINFM05356498-60-001$1,575,809ROUTINE MAINTENANCE PROJECT - SEALED-PAVEMENT MARKINGS
04/13/2026(11)BASTROPAUSTINSH00716497-45-001$449,236ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/23/2026(6)BAYLORWICHITA FALLSUS00826500-74-001$805,841MATERIAL MAINTENANCE PROJECT-HOT MIX
04/14/2026(7)BEECORPUS CHRISTIUS01816500-30-001$630,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/14/2026(33)BEECORPUS CHRISTIUS01816413-83-001$491,500ROUTINE MAINTENANCE PROJECT - SEALED-SPOT BASE REPAIR
04/20/2026(50)BELLWACOFM16706493-36-001$255,448ROUTINE MAINTENANCE PROJECT-TREE TRIMMING AND BRUSH REMOVAL
04/07/2026(796)BEXARSAN ANTONIOSL 16042452-01-066$61,080,463WIDEN NON-FREEWAY-WIDEN ROAD - ADD LANES
04/07/2026(189)BEXARSAN ANTONIOSL 3680016-08-049$4,814,214OVERLAY-RESURFACE ROADWAY
04/08/2026(1523)BEXARSAN ANTONIOFM 15602230-01-020$85,507,222WIDEN NON-FREEWAY-WIDEN ROAD - ADD LANES
04/08/2026(362)BEXARSAN ANTONIOIH 350017-10-294$34,558,202CULVERT & STORM DRAINAGE WORK-INSTALL/UPGRADE DRAINAGE STRUCTURE(S)
04/06/2026(7)BOWIEATLANTAUS00596497-92-001$697,500MATERIAL MAINTENANCE PROJECT-EMULSION
04/07/2026(141)BRAZORIAHOUSTONSH 2880598-02-120$5,309,851CORRIDOR TRAFFIC MANAGEMENT-ADVANCED TRAFFIC MANAGEMENT SYSTEM
04/22/2026(6)BROWNBROWNWOODUS01836500-94-001$690,000MATERIAL MAINTENANCE PROJECT-PAINT AND BEADS
04/22/2026(6)BROWNBROWNWOODUS03776499-92-001$276,048MATERIAL MAINTENANCE PROJECT-HOT MIX
04/08/2026(70)BURNETAUSTINRM02436498-59-001$1,706,599ROUTINE MAINTENANCE PROJECT - SEALED-PAVEMENT MARKINGS
04/06/2026(42)CALHOUNYOAKUMFM10906498-26-001$599,961ROUTINE MAINTENANCE PROJECT - SEALED-ASPHALT PAVEMENT REPAIR
04/22/2026(3)CALHOUNYOAKUMSH00356495-16-001$980,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/22/2026(3)CALHOUNYOAKUMSH00356495-17-001$500,000MATERIAL MAINTENANCE PROJECT-HOT-MIX COLD-LAID
04/07/2026(317)CALLAHANABILENESH 360181-03-029$10,675,511SUPER-2 HIGHWAY-WIDEN ROAD - ADD LANES
04/07/2026(64)CAMERONPHARRUS00776470-82-001$3,735,225ROUTINE MAINTENANCE PROJECT - SEALED-ASPHALT PAVEMENT REPAIR
04/08/2026(156)CAMERONPHARRFM 14191426-01-058$7,236,974OVERLAY-PREVENTIVE MAINTENANCE
04/07/2026(144)CASSATLANTASH 110218-05-037$2,530,848SAFETY IMPROVEMENT PROJECTS-HAZARD ELIMINATION & SAFETY
04/15/2026(4)COLLINDALLASSH00056495-65-001$80,000MATERIAL MAINTENANCE PROJECT-AGGREGATE
04/15/2026(4)COLLINDALLASSH00056495-67-001$40,000MATERIAL MAINTENANCE PROJECT-EMULSION
04/15/2026(50)COLLINDALLASSH00786489-38-001$251,086ROUTINE MAINTENANCE PROJECT - SEALED-SPECIALTY MARKINGS
04/15/2026(21)COLLINDALLASUS00756495-80-001$89,700ROUTINE MAINTENANCE PROJECT - SEALED-HERBICIDE/INSECTICIDE
04/15/2026(22)COLLINDALLASUS00756495-79-001$453,640ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/15/2026(27)COLLINDALLASUS00756495-82-001$72,320ROUTINE MAINTENANCE PROJECT - SEALED-STORM SEWER AND DRAIN INLET CLEANING
04/15/2026(23)COLLINDALLASUS03806495-78-001$308,325ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/08/2026(58)COMALSAN ANTONIOSL 3370216-01-062$1,034,120SAFETY IMPROVEMENT PROJECTS-HAZARD ELIMINATION & SAFETY
04/20/2026(50)CORYELLWACOFM09326493-37-001$574,009ROUTINE MAINTENANCE PROJECT-TREE TRIMMING AND BRUSH REMOVAL
04/07/2026(72)DALLASDALLASIH 300009-11-278$509,990BRIDGE MAINTENANCE
04/07/2026(189)DALLASDALLASSH 2890091-06-062$2,836,917SAFETY IMPROVEMENT PROJECTS-TRAFFIC SIGNAL IMPROVEMENTS
04/08/2026(304)DALLASDALLASUS 1750197-02-138$4,415,700FREEWAY OPERATIONAL IMPROVEMENTS-CONSTRUCT RAMPS
04/07/2026(155)DELTAPARISFM 1280735-01-020$5,629,633REHABILITATION OF EXISTING ROAD-REHABILITATE EXISTING ROADWAY
04/16/2026(6)DELTAPARISSH01546500-11-001$720,500MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/15/2026(74)DENTONDALLASIH0035W6496-04-001$760,495ROUTINE MAINTENANCE PROJECT - SEALED-METAL BEAM GUARD FENCE REPAIR
04/22/2026(4)DIMMITLAREDOUS02776500-53-001$999,200MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/23/2026(4)DUVALLAREDOSH00166498-98-001$800,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/22/2026(6)EASTLANDBROWNWOODSH00066496-49-001$152,500MATERIAL MAINTENANCE PROJECT-AGGREGATE
04/22/2026(6)EASTLANDBROWNWOODSH00066496-50-001$189,000MATERIAL MAINTENANCE PROJECT-HYDRAULIC CEMENT
04/07/2026(176)ECTORODESSAFM 18822005-03-009$7,771,645REHABILITATION OF EXISTING ROAD-REHABILITATE EXISTING ROADWAY
04/21/2026(22)ECTORODESSAIH00206498-88-001$640,740ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/21/2026(6)ECTORODESSASL03386498-14-001$35,750MATERIAL MAINTENANCE PROJECT-FLEXIBLE BASE
04/21/2026(6)ECTORODESSASL03386500-35-001$25,500MATERIAL MAINTENANCE PROJECT-AGGREGATE
04/21/2026(48)ECTORODESSASL03386499-60-001$660,927BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE PREVENTATIVE MAINTENANCE
04/08/2026(154)EL PASOEL PASOFM 760674-01-083$1,307,462PEDESTRIAN, SIDEWALKS & CURB RAMPS-CONSTRUCT PEDESTRIAN INFRASTRUCTURE
04/08/2026(44)ELLISDALLASBU0287S6489-29-001$1,437,046ROUTINE MAINTENANCE PROJECT - SEALED-FLEXIBLE PAVEMENT STRUCTURE REPAIR
04/07/2026(162)ERATHFORT WORTHUS 670079-05-067$4,188,151BRIDGE MAINTENANCE
04/07/2026(124)FALLSWACOCOUNTY ROAD 0909-38-100$1,388,814BRIDGE REPLACEMENT
04/16/2026(6)FANNINPARISUS00696499-97-001$747,200MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/07/2026(253)FISHERABILENECOUNTY ROAD 0908-23-045$4,574,023BRIDGE REPLACEMENT
04/08/2026(131)FISHERABILENECR 3050908-23-058$2,507,178BRIDGE REPLACEMENT
04/08/2026(60)FORT BENDHOUSTONFM 3590543-02-089$721,613BRIDGE WIDENING OR REHABILITATION-REHABILITATE BRIDGE
04/14/2026(53)FORT BENDHOUSTONUS00596494-55-001$412,300ROUTINE MAINTENANCE PROJECT - SEALED-CRASH CUSHION ATTENUATOR REPAIR
04/14/2026(72)FORT BENDHOUSTONUS00596494-56-001$303,181ROUTINE MAINTENANCE PROJECT - SEALED-METAL BEAM GUARD FENCE REPAIR
04/16/2026(6)FRANKLINPARISIH00306499-73-001$549,128MATERIAL MAINTENANCE PROJECT-HYDRAULIC CEMENT
04/16/2026(38)FRANKLINPARISSH00376498-80-001$253,524ROUTINE MAINTENANCE PROJECT - SEALED-CULVERT REPAIR
04/16/2026(6)FRANKLINPARISUS00676500-00-001$792,000MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/14/2026(39)FREESTONEBRYANUS00846498-82-001$73,031ROUTINE MAINTENANCE PROJECT-SWEEPING AND DEBRIS REMOVAL
04/08/2026(167)GALVESTONHOUSTONIH 450500-01-154$3,887,385LANDSCAPE & SCENIC ENHANCEMENT-LANDSCAPE DEVELOPMENT
05/06/2026(270)GALVESTONHOUSTONVARIOUS0912-73-222$65,500,000FERRY BOAT-FERRY OPERATION PROJECTS
04/08/2026(124)GRAYAMARILLOSH 700309-01-048$3,424,040BRIDGE MAINTENANCE
04/07/2026(1363)GRAYSONPARISUS 750047-03-091$140,498,838WIDEN FREEWAY-WIDEN ROAD - ADD LANES
04/16/2026(66)GRAYSONPARISUS00826481-24-001$544,062BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE PREVENTATIVE MAINTENANCE
04/22/2026(68)GUADALUPESAN ANTONIOUA00906491-46-001$124,897BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE RAIL REPAIR
04/21/2026(6)HALELUBBOCKIH00276499-11-001$775,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/21/2026(6)HALELUBBOCKIH00276499-15-001$437,500MATERIAL MAINTENANCE PROJECT-ASPHALTIC PATCHING MATERIAL
04/22/2026(9)HANSFORDAMARILLOSH01366498-56-001$593,750MATERIAL MAINTENANCE PROJECT-HOT MIX
04/07/2026(109)HARRISHOUSTONFM 21001062-04-063$1,578,950OVERLAY-REHABILITATE EXISTING ROADWAY
04/07/2026(63)HARRISHOUSTONFM 5291006-01-082$468,119TRANSPORTATION NON-ROADWAY-EMBANKMENT STABILIZATION
04/08/2026(2226)HARRISHOUSTONSH 993510-05-047$135,992,054WIDEN FREEWAY-WIDEN ROAD - ADD LANES
04/14/2026(56)HARRISHOUSTONIH00696498-23-001$879,642ROUTINE MAINTENANCE PROJECT - SEALED-PAVEMENT MARKINGS
04/14/2026(81)HARRISHOUSTONSH00066495-93-001$517,099BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE PREVENTATIVE MAINTENANCE
04/14/2026(40)HARRISHOUSTONSL00086495-73-001$237,549ROUTINE MAINTENANCE PROJECT - SEALED-DRAINAGE IMPROVEMENT AND/OR REPAIRS
04/08/2026(569)HAYSAUSTINRM 120683-05-017$10,113,847WIDEN NON-FREEWAY-PREVENTIVE MAINTENANCE
04/07/2026(123)HIDALGOPHARRIH 69C0255-07-153$8,135,339OVERLAY-PREVENTIVE MAINTENANCE
04/07/2026(20)HIDALGOPHARRIH00026497-78-001$1,303,042ROUTINE MAINTENANCE PROJECT - SEALED-SWEEPING AND DEBRIS REMOVAL
04/07/2026(118)HIDALGOPHARRVARIOUS0921-02-551$1,682,282RAIL HWY CROSSING SIGNALS/STRUCTURES-RAILROAD CROSSING IMPROVEMENTS
04/08/2026(58)HIDALGOPHARRSH04956489-47-001$1,359,546ROUTINE MAINTENANCE PROJECT - SEALED-INSTALLATION OF FLASHING BEACONS AND P
04/08/2026(112)HOODFORT WORTHOLD GRANBURY0902-51-029$795,481BRIDGE REPLACEMENT
04/16/2026(6)HOPKINSPARISIH00306500-12-001$742,500MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/09/2026(50)HUDSPETHEL PASOIH00106495-55-001$525,850ROUTINE MAINTENANCE PROJECT-TRAFFIC CONTROL SERVICES
04/16/2026(6)HUNTPARISIH00306500-13-001$649,750MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/08/2026(195)JACKSONYOAKUMSH 350179-09-041$21,500,022BRIDGE REPLACEMENT
04/22/2026(3)JACKSONYOAKUMSH01116495-14-001$997,500MATERIAL MAINTENANCE PROJECT-HOT MIX
04/22/2026(3)JACKSONYOAKUMSH01116495-15-001$285,000MATERIAL MAINTENANCE PROJECT-HOT-MIX COLD-LAID
04/14/2026(6)JIM WELLSCORPUS CHRISTIUS02816499-88-001$480,192ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/16/2026(65)KIMBLESAN ANGELOUS03776474-39-001$523,020ROUTINE MAINTENANCE PROJECT-METAL BEAM GUARD FENCE REPAIR
04/14/2026(7)KLEBERGCORPUS CHRISTIUS00776500-63-001$466,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/08/2026(61)LAMARPARISVARIOUS0901-00-069$823,730BRIDGE MAINTENANCE
04/16/2026(6)LAMARPARISUS00826500-03-001$720,500MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/16/2026(60)LAMARPARISUS00826497-30-001$659,279ROUTINE MAINTENANCE PROJECT - SEALED-TRAFFIC SIGNAL MAINTENANCE
04/21/2026(6)LAMBLUBBOCKUS00846499-12-001$775,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/21/2026(6)LAMBLUBBOCKUS00846499-14-001$437,500MATERIAL MAINTENANCE PROJECT-ASPHALTIC PATCHING MATERIAL
04/07/2026(149)LAVACAYOAKUMFM 5310269-10-028$2,177,688SAFETY IMPROVEMENT PROJECTS-HAZARD ELIMINATION & SAFETY
04/08/2026(160)LIMESTONEWACOCOUNTY ROAD 0909-40-081$2,205,161BRIDGE REPLACEMENT
04/14/2026(74)LIVE OAKCORPUS CHRISTIUS02816499-65-001$850,025BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE PREVENTATIVE MAINTENANCE
04/13/2026(7)LLANOAUSTINSH00716484-35-001$333,680ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/07/2026(158)LUBBOCKLUBBOCKFM 8350933-01-044$4,462,426BRIDGE REPLACEMENT
04/08/2026(252)LUBBOCKLUBBOCKUPLAND AVE0905-06-096$14,464,478WIDEN NON-FREEWAY-WIDEN ROAD - ADD LANES
04/21/2026(5)LUBBOCKLUBBOCKIH00276499-13-001$310,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/21/2026(5)LUBBOCKLUBBOCKIH00276499-16-001$175,000MATERIAL MAINTENANCE PROJECT-ASPHALTIC PATCHING MATERIAL
04/08/2026(138)MARTINODESSAFM 12081823-01-011$9,927,435REHABILITATION OF EXISTING ROAD-HIGHWAY IMPROVEMENT
04/07/2026(1296)MAVERICKLAREDOSL 4800299-14-010$123,643,818NEW LOCATION NON-FREEWAY-CONSTRUCT NEW ROAD
04/08/2026(66)MCLENNANWACOUS00846497-03-001$968,609ROUTINE MAINTENANCE PROJECT - SEALED-MISCELLANEOUS CONCRETE REPAIR
04/21/2026(6)MIDLANDODESSAIH00206498-11-001$35,750MATERIAL MAINTENANCE PROJECT-FLEXIBLE BASE
04/21/2026(62)MIDLANDODESSAIH00206498-21-001$334,350ROUTINE MAINTENANCE PROJECT-METAL BEAM GUARD FENCE REPAIR
04/08/2026(79)MITCHELLABILENEIH 200005-08-109$12,515,643OVERLAY-PREVENTIVE MAINTENANCE
04/07/2026(86)MONTGOMERYHOUSTONSH 2423538-01-070$2,075,081LANDSCAPE & SCENIC ENHANCEMENT-LANDSCAPE DEVELOPMENT
04/08/2026(47)MONTGOMERYHOUSTONIH00456495-98-001$1,625,355ROUTINE MAINTENANCE PROJECT-CLEANING AND SWEEPING HIGHWAYS
04/14/2026(61)MONTGOMERYHOUSTONIH00456493-67-001$755,901ROUTINE MAINTENANCE PROJECT - SEALED-REFLECTIVE PAVEMENT MARKINGS (LONG LIN
04/28/2026(4)NACOGDOCHESLUFKINFM03436498-51-001$850,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/15/2026(33)NAVARRODALLASSH00316495-33-001$417,029ROUTINE MAINTENANCE PROJECT - SEALED-REFLECTORIZED PAVEMENT MARKINGS & MARK
04/07/2026(230)NUECESCORPUS CHRISTIVARIOUS0916-35-264$412,873RAIL HWY CROSSING SIGNALS/STRUCTURES-HIGHWAY/RAILROAD IMPROVEMENT
04/08/2026(187)NUECESCORPUS CHRISTIVARIOUS0916-00-286$351,499RAIL HWY CROSSING SIGNALS/STRUCTURES-HIGHWAY/RAILROAD IMPROVEMENT
04/08/2026(239)NUECESCORPUS CHRISTIVARIOUS0916-00-287$455,717RAIL HWY CROSSING SIGNALS/STRUCTURES-HIGHWAY/RAILROAD IMPROVEMENT
04/08/2026(185)NUECESCORPUS CHRISTIYORKTOWN BLV0916-35-251$15,711,848BRIDGE REPLACEMENT
04/07/2026(65)PARKERFORT WORTHIH 200314-07-087$537,434TRAFFIC CONTROL DEVICES-INSTALL/REPLACE SIGNS
04/21/2026(6)PECOSODESSABI0010G6498-09-001$45,500MATERIAL MAINTENANCE PROJECT-FLEXIBLE BASE
04/21/2026(62)PECOSODESSAIH00106498-89-001$349,050ROUTINE MAINTENANCE PROJECT-METAL BEAM GUARD FENCE REPAIR
04/27/2026(7)POLKLUFKINUS00596498-49-001$820,600MATERIAL MAINTENANCE PROJECT-EMULSION
04/07/2026(176)POTTERAMARILLORM 10611245-02-052$7,802,745OVERLAY-PREVENTIVE MAINTENANCE
04/16/2026(6)RAINSPARISUS00696499-98-001$637,000MATERIAL MAINTENANCE PROJECT-DENSE GRADED HOT MIX
04/22/2026(7)RANDALLAMARILLOIH00276498-79-001$44,460MATERIAL MAINTENANCE PROJECT-LIME
04/22/2026(21)RANDALLAMARILLOIH00276500-21-001$486,960ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/07/2026(151)ROCKWALLDALLASFM 5501014-03-065$2,169,620TRAFFIC CONTROL DEVICES-INSTALL TRAFFIC SIGNAL
04/08/2026(118)ROCKWALLDALLASFM 5481016-04-021$3,419,170OVERLAY-RESURFACE ROADWAY
04/07/2026(183)RUSKTYLERFM 12511388-01-010$9,650,419REHABILITATION OF EXISTING ROAD-ROADWAY REHABILITATION/RECONSTRUCTION WI
04/22/2026(28)SABINELUFKINSH00216489-07-001$298,350ROUTINE MAINTENANCE PROJECT - SEALED-TREE TRIMMING AND BRUSH REMOVAL
04/27/2026(7)SABINELUFKINFM00836498-47-001$826,250MATERIAL MAINTENANCE PROJECT-EMULSION
04/09/2026(47)SAN AUGUSTINELUFKINUS00966498-19-001$957,125ROUTINE MAINTENANCE PROJECT - SEALED-TRAFFIC CONTROL SERVICES
04/22/2026(24)SAN AUGUSTINELUFKINUS00966496-28-001$183,906ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/27/2026(7)SAN AUGUSTINELUFKINUS00966498-48-001$720,800MATERIAL MAINTENANCE PROJECT-EMULSION
04/09/2026(29)SAN JACINTOLUFKINUS00596490-69-001$95,300ROUTINE MAINTENANCE PROJECT - SEALED-TREE TRIMMING AND BRUSH REMOVAL
04/28/2026(6)SAN JACINTOLUFKINSH01506498-50-001$705,750MATERIAL MAINTENANCE PROJECT-HOT MIX
04/07/2026(8)SMITHTYLERUS00696499-43-001$3,173,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/07/2026(130)SMITHTYLERVARIOUS0910-00-144$3,297,937BRIDGE MAINTENANCE
04/08/2026(120)SMITHTYLERSL 3231790-02-048$1,629,506BRIDGE REPLACEMENT-CONSTRUCT BRIDGE
04/21/2026(46)SMITHTYLERIH00206499-42-001$151,550ROUTINE MAINTENANCE PROJECT - SEALED-LARGE SIGN REPLACEMENT
04/09/2026(4)SUTTONSAN ANGELOUS02776500-10-001$44,916MATERIAL MAINTENANCE PROJECT-EMULSION
04/07/2026(111)TARRANTFORT WORTHFM 11871330-02-052$8,810,552OVERLAY-RESURFACE ROADWAY
04/08/2026(97)TARRANTFORT WORTHSH 100094-02-147$5,591,882OVERLAY-RESURFACE ROADWAY
04/08/2026(85)TARRANTFORT WORTHUS 2870172-09-046$286,038TRAFFIC CONTROL DEVICES-INSTALL/REPLACE SIGNS
04/21/2026(6)TERRYLUBBOCKUS00626499-10-001$697,500MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/16/2026(84)TOM GREENSAN ANGELORM05846487-86-001$588,345ROUTINE MAINTENANCE PROJECT - SEALED-REHABILITATION OF EXISTING ROADWAY
05/05/2026(34)TOM GREENSAN ANGELOSH02086477-64-001$686,415ROUTINE MAINTENANCE PROJECT - SEALED-RAISED PAVEMENT MARKERS
04/08/2026(84)TRAVISAUSTINVARIOUS0914-00-516$513,907TRAFFIC CONTROL DEVICES-INSTALL/REPLACE SIGNS
04/22/2026(27)TRINITYLUFKINSH00946496-35-001$159,554ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/08/2026(122)TYLERBEAUMONTUS 2870341-04-074$20,662,478REHABILITATION OF EXISTING ROAD-SURFACING/ROADWAY RESTORATION
04/21/2026(7)VAN ZANDTTYLERUS00806499-76-001$255,000MATERIAL MAINTENANCE PROJECT-FLEXIBLE BASE
04/06/2026(24)VICTORIAYOAKUMUS00596500-16-001$567,500BRIDGE PREVENTATIVE MAINTENANCE - SEALED-BRIDGE JOINT REPAIR
04/22/2026(3)VICTORIAYOAKUMUS00596494-90-001$89,250MATERIAL MAINTENANCE PROJECT-ROCK/RIPRAP
04/22/2026(3)VICTORIAYOAKUMUS00596494-91-001$324,750MATERIAL MAINTENANCE PROJECT-EMULSION
04/22/2026(3)VICTORIAYOAKUMUS00596494-95-001$738,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/22/2026(3)VICTORIAYOAKUMUS00596495-09-001$240,899MATERIAL MAINTENANCE PROJECT-HYDRAULIC CEMENT
04/22/2026(3)VICTORIAYOAKUMUS00596495-10-001$479,400MATERIAL MAINTENANCE PROJECT-AGGREGATE
04/22/2026(3)VICTORIAYOAKUMUS00596495-11-001$298,500MATERIAL MAINTENANCE PROJECT-FLEXIBLE BASE
04/22/2026(3)VICTORIAYOAKUMUS00596495-12-001$990,000MATERIAL MAINTENANCE PROJECT-HOT MIX
04/22/2026(3)VICTORIAYOAKUMUS00596495-13-001$475,000MATERIAL MAINTENANCE PROJECT-HOT-MIX COLD-LAID
04/22/2026(3)VICTORIAYOAKUMUS00596495-89-001$19,688MATERIAL MAINTENANCE PROJECT-LIME
04/08/2026(66)WALLERHOUSTONFM 18871745-01-020$848,686OVERLAY-RESURFACE ROADWAY
04/14/2026(55)WALLERHOUSTONUS02906495-46-001$392,435ROUTINE MAINTENANCE PROJECT - SEALED-ASPHALT PAVEMENT REPAIR
04/07/2026(108)WASHINGTONBRYANARTESIAN PAR0917-19-062$800,383BRIDGE REPLACEMENT
04/07/2026(33)WASHINGTONBRYANUS02906499-09-001$1,915,390ROUTINE MAINTENANCE PROJECT-TRAFFIC CONTROL SERVICES
04/08/2026(65)WASHINGTONBRYANUS 2900114-10-108$6,122,429OVERLAY-SURFACING/ROADWAY RESTORATION
04/14/2026(7)WASHINGTONBRYANSH00366498-63-001$208,008MATERIAL MAINTENANCE PROJECT-HYDRAULIC CEMENT
04/14/2026(7)WASHINGTONBRYANSH00366498-64-001$282,000MATERIAL MAINTENANCE PROJECT-LIMESTONE ROCK ASPHALT
04/08/2026(88)WEBBLAREDOFM 14722150-03-034$823,514TRAFFIC CONTROL DEVICES-INSTALL TRAFFIC SIGNAL
04/07/2026(99)WILLIAMSONAUSTINFM 6190986-03-015$1,713,955SEAL COAT-PREVENTIVE MAINTENANCE
04/07/2026(99)WILLIAMSONAUSTINSH 290337-02-054$2,566,159OVERLAY-PREVENTIVE MAINTENANCE
04/21/2026(21)WINKLERODESSASH03026499-41-001$201,460ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/15/2026(33)WISEFORT WORTHUS03806496-17-001$814,245ROUTINE MAINTENANCE PROJECT - SEALED-MOWING HIGHWAY RIGHT OF WAY
04/28/2026(14)WOODTYLERUS00696500-77-001$866,275ROUTINE MAINTENANCE PROJECT-MOWING HIGHWAY RIGHT OF WAY
04/07/2026(95)ZAVALALAREDOLA PALOMA0922-48-004$1,631,537BRIDGE REPLACEMENT
04/07/2026(120)ZAVALALAREDOLA PALOMA0922-48-004$1,631,537BRIDGE REPLACEMENT

Shipping costs added to printing costs
Thin sets are stapled, otherwise we bind with screw posts.
 Acct Number, if known
 Company *
 Name *
 Phone *
 EMail Addr **

If you are not a current Whitley & Siddons customer, we will contact you about setting up an account for this

* Required Field
** Note: E-Mail Address is optional, but will be used to keep you posted on the status of your order and you will be sent a copy of this order to this address.


Special Instructions